Building permit applications in Chilliwack
Chilliwack, British Columbia, Canada
Chilliwack, British Columbia, Canada. Begin a digital building permit in MyCity, then upload plans and documents through ProjectDox. Pre-screen checks complet
Key information
Begin a digital building permit in MyCity, then upload plans and documents through ProjectDox. Pre-screen checks completeness before the project gets an accepted application date and enters technical review.
On this page
Two systems with different jobs
MyCity starts the application and lets you track permits. ProjectDox handles drawings, documents, mark-ups and plan review. First-time applicants register for both as required by the invitation emails.
The city accepts digital applications across construction types, including homes, additions, accessory/agricultural buildings, Part 3 buildings, tenant improvements, demolition, utility connections and signs. Hard-copy submissions remain accepted.
Sources: Digital permit system, pre-screen and upload steps · Building permit forms and submission requirements
Upload and submit correctly
After creating the MyCity application, watch the applicant email for a ProjectDox task. Accept the Upload and Submit task before adding files. Put plans under Upload Drawings and other documents under Upload Documents.
Use the city PDF-formatting and naming guide. Saving for later does not submit the completed task. Press Submit after all required files are uploaded.
Sources: Digital permit system, pre-screen and upload steps · Building permit forms and submission requirements
Completeness is not approval
Pre-screen checks missing items, not code compliance. A ProjectDox request for additional information may lead to cancellation if unanswered for five to seven business days.
Accepted applications get an application date and join the review queue. A representative needs the owner’s authorization. Demolition needs the hazardous-risk assessment verification; the city says it does not require or accept asbestos-abatement reports.
Sources: Digital permit system, pre-screen and upload steps · Building permit forms and submission requirements
Key details at a glance
| Item | Details |
|---|---|
| MyCity | Starts application and permit tracking |
| ProjectDox | Document upload and plan review |
| Pre-screen | Completeness check, not technical approval |
| Missing-document response | Five to seven business days before possible cancellation |
| Hard-copy route | Still accepted |
Sources: Digital permit system, pre-screen and upload steps · Building permit forms and submission requirements
Steps to follow
- Start in MyCity
Enter the correct construction and applicant details.
- Accept ProjectDox task
Upload drawings and supporting documents separately.
- Submit complete package
Respond to pre-screen and enter review after acceptance.
Sources: Digital permit system, pre-screen and upload steps · Building permit forms and submission requirements
Named service locations
Maps use the official address or named site. They do not confirm a particular accessible entrance, current opening status or available parking.
Chilliwack City Hall
8550 Young Road
City Hall contains the municipal service and payment counters. Payment service hours are weekdays 8:30 a.m. to 4:30 p.m., excluding statutory holidays.
Sources: Tax payment methods
Useful questions and answers
Are MyCity and ProjectDox the same system?
No. MyCity starts the application; ProjectDox manages the document review.
Which email gets the task invitation?
The applicant email entered on the MyCity application.
Can I upload before accepting the task?
No. Accept the Upload and Submit task first.
Where do engineering schedules and authorization letters go?
Under Upload Documents, separate from building plans.
Does Save for Later finish submission?
No. Complete the task with Submit when all required files are ready.
Does pre-screen mean code approval?
No. It checks completeness only.
What if I do not answer a missing-document request?
The city may cancel after five to seven business days.
When is an application date assigned?
After the submission is accepted following pre-screen.
Are paper applications still allowed?
Yes, the general permit page still accepts hard copies.
Does a demolition submission need an asbestos report?
The city asks for hazardous-risk verification and says it does not require or accept asbestos-abatement reports.