Book building inspections in Chilliwack

Chilliwack, British Columbia, Canada

Chilliwack, British Columbia, Canada. Book ordinary inspections before 3:30 p.m. at least one business day before they are needed. Large-project coordinated f

Key information

Book ordinary inspections before 3:30 p.m. at least one business day before they are needed. Large-project coordinated final or occupancy inspections need at least two business days. The eInspections service accepts requests around the clock.

On this page

Book the right inspection

Use eInspections online or call 604-793-2905 during business hours. Give the street address, permit/folder number and inspection type. Online availability does not remove the submission cutoff.

Large multifamily, commercial, industrial and institutional coordinated final/occupancy requests need two business days, plus the required confirmation and documentation binder.

Sources: Inspection booking lead times · Complete typical required inspection list

Keep the site ready

Post the fluorescent orange permit card where it is visible from the road. Keep approved plans available at every inspection. Written departmental approval is required before deviating from the plans or permit.

Footing forms must be approved before concrete is poured. Construction cannot continue beyond the foundation-form stage until the BC land surveyor’s certificate is submitted and approved.

Sources: Inspection booking lead times · Complete typical required inspection list

Complete the required stages

The table preserves every typical inspection named on the city list for single, two-family and townhouse work. Not every item applies to every project; the inspector and permit determine required stages.

Inspection readiness matters. Occupancy must be granted before the building is occupied. The city also states the building permit becomes void if construction has not begun within six months of issue.

Sources: Inspection booking lead times · Complete typical required inspection list

Key details at a glance

Book building inspections in Chilliwack. Information checked October 14, 2026.
ItemDetails
Footing, including column/spot footingsCall for inspection at the relevant stage; confirm applicability with permit
Drain tile, rainwater distribution and damp proofing before backfillCall for inspection at the relevant stage; confirm applicability with permit
Underslab/foundation insulation and vapour barrier before slabCall for inspection at the relevant stage; confirm applicability with permit
Radon underslab rough-inCall for inspection at the relevant stage; confirm applicability with permit
Underslab plumbingCall for inspection at the relevant stage; confirm applicability with permit
Water, sanitary and storm servicesCall for inspection at the relevant stage; confirm applicability with permit
Rough plumbingCall for inspection at the relevant stage; confirm applicability with permit
Radon rough-inCall for inspection at the relevant stage; confirm applicability with permit
Wood-burning chimney and fireplaceCall for inspection at the relevant stage; confirm applicability with permit
Framing and firestoppingCall for inspection at the relevant stage; confirm applicability with permit
Rain screenCall for inspection at the relevant stage; confirm applicability with permit
Stucco lath/reinforcing before stuccoCall for inspection at the relevant stage; confirm applicability with permit
Insulation and vapour barrierCall for inspection at the relevant stage; confirm applicability with permit
Final/occupancy before occupationCall for inspection at the relevant stage; confirm applicability with permit

Sources: Inspection booking lead times · Complete typical required inspection list

Steps to follow

Book building inspections in Chilliwack: your next steps
  1. Choose required stage

    Read the permit and full inspection list.

  2. Book within cutoff

    Ordinary and coordinated-final lead times differ.

  3. Prepare site and plans

    Do not pour, cover or occupy ahead of approval.

Sources: Inspection booking lead times · Complete typical required inspection list

Useful questions and answers

Can I request online after office hours?

Yes. eInspections accepts requests 24/7, but normal cutoffs still apply.

Source: Inspection booking lead times

What is the ordinary request cutoff?

Before 3:30 p.m. at least one business day before the inspection.

Source: Inspection booking lead times

How much notice does a coordinated large-project final need?

At least two business days.

Source: Inspection booking lead times

What information does a telephone request need?

Address, permit/folder number and inspection type.

Source: Inspection booking lead times

Where must the permit card be?

Posted at the job site and visible from the road.

Source: Complete typical required inspection list

Must plans be available to the inspector?

Yes. They must be on site for each inspection.

Source: Complete typical required inspection list

Can I pour footings before approval?

No. The forms must be inspected and approved first.

Source: Complete typical required inspection list

What is required before work goes beyond foundation forms?

A BC land surveyor’s certificate must be submitted and approved.

Source: Complete typical required inspection list

Can I change approved plans without written approval?

No. Written Building Department approval is required.

Source: Complete typical required inspection list

Can people occupy before the final occupancy approval?

No. Occupancy must be granted first.

Source: Complete typical required inspection list